WHAT'S INCLUDED

  • Bathroom remodels: tile, showers, vanities, fixtures
  • Kitchen updates and full renovations
  • Basement finishing
  • Whole-room renovations
  • Decks, porches, doors and windows
  • Repairs and rebuilds after water or storm damage
Warranty
5-year workmanship warranty on every remodel, plus the manufacturer's warranty on fixtures and materials.
Timing
A typical hall bath takes two to three weeks once materials are in hand.

HOW IT WORKS

Here's how a remodel usually goes.

  1. Plan

    We talk through what you want, measure and sketch a scope.

  2. Price

    A written proposal with allowances for the finishes you'll choose.

  3. Build

    Demo, rough-in, finishes and paint on a schedule we share with you.

  4. Walkthrough

    A punch list together, then it's yours.

QUESTIONS

Common questions

More answers on the FAQ page, or call 770-318-0716.

How long does a bathroom remodel take?

A typical hall bath takes two to three weeks once materials are in hand. We'll give you a schedule before we start.

Do you do the whole job or just parts?

Either. We'll remodel the whole room or come in for the part you need, like a tile shower or new flooring.

FREE ESTIMATES

Let's talk about your home.

You don't need to have everything figured out before you call. Tell us what you're dealing with or what you'd like to change, and we'll help you work through the next step.